Primavera P6 Professional Advanced for Project Managers

Achieve advanced knowledge regarding Primavera Software

ABOUT THE PROGRAM

Management is the crucial part of every organisation. It includes planning, implementing, executing and monitoring the organisational services. Primavera is well-known software for managing and controlling the project activities. We at MSP introduces Primavera P6 Professional Advanced for Project Managers course to provide advanced knowledge regarding the Primavera software. This includes managing multiple projects at a time, assign constraints and planning budget.

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

Includes

Certificate

Delegates will get certification of completion at the end of the course.

PREREQUISITES

The professionals who want to attend this course must hold Primavera P6 Professional Fundamental certification.

TARGET AUDIENCE

Primavera P6 Professional Advanced for Project Managers course is best suited for the following audience:

  • Project Managers
  • Business Analysts
  • Operational Staff
  • Team Leaders
  • Programme Managers
  • Risk Managers

WHAT WILL YOU LEARN?

At the end of the training, the delegates will be able to:

  • Add activities and schedule various tasks
  • Create portfolio in Primavera P6
  • Effectively control and execute the project
  • Handle risk and challenges associated with the project
  • Plan and allocate resources for better output

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

This training programme includes practical knowledge of handling multiple projects at a time. The major topics included in the training are resource levelling, viewing, verifying portfolio performance, the creation of resources and role teams.

Primavera P6 helps in monitoring the progress and report mechanism of the project. It provides the following:

  • Clear picture of the project so that no misassumptions are there regarding project stages
  • Optimise time and resources in order to fast way the progress
  • Better understanding and handling of the project than before using Primavera Software
  • Manage vast and complex projects using this software
  • Handling multiple projects at a time to increase the productivity
  • It is demanding software that is used in construction, engineering, security, transport, aerospace and many more fields

PROGRAM CONTENT

Introduction: Earned Value Analysis

  • Define Earned Value Analysis
  • Planned Value, Earned Value and Actual Cost
  • Calculate complete performance percent

Overview of multiple projects management

  • Opening multiple projects
  • Setting default project

Introduction: Resources and Roles

  • Overview of roles and resources
  • Dictionary views
  • Assign role to a process
  • Allocate rates on roles
  • Assign Resources
  • Allocate resources
  • Adapt budgeted units/time
  • Investigate resources
  • Indicate the resource usage profile
  • Consume the Resource Usage Profile and Spreadsheet

Manually Allocation of Resources

  • An introduction to resource allocation
  • Displaying the assignments window
  • Detecting and editing allocation

Introduction: Schedule

  • An Introduction to Critical Path Method Scheduling and the Impact of Float
  • Accomplishment of Forwarding and Backwards passes
  • The out of Sequence activities
  • Describing Float

Introduction: Assign Constraints

  • Deliberating a general deadline to a Project
  • Smearing constraint to an activity

Introduction: Bucket Plan

  • An introduction to bucket planning
  • Removing Future Buckets
  • Use of Curves

Introduction: Leveling Resources

  • Introducing placing levelling options
  • Understanding priority levelling

Introduction: Advanced Scheduling

  • Scheduling multiple float paths
  • Introducing calendar effect on lag
  • Scheduling Out-of- Sequence methods

Introduction: Global Change

  • Creating user-defined field
  • Performing a global change

Introduction: Timescale logic diagrams

  • Choosing a template
  • How to filter data?

Understand user preferences

  • Introducing user preferences
  • Optional user preference settings

Activity Codes

  • An introduction to activity codes
  • How to generate and handle Global, EPS and Project level activity codes
  • Understanding User Defined Fields (UDFs)
  • Introducing project codes and resource codes

Global Change

  • How to bring global change?
  • How to generate named global change configurations?
  • Exporting and Importing global change configurations

Activity Steps

  • An introduction to activity steps
  • How to set up for a P6 Project for activity steps
  • Allocating steps to an activity
  • Generating an activity step template
  • Driving progress using steps

Customise Gantt Chart Bars

  • An introduction to the bars dialogue
  • Adapting existing Bars
  • Generating custom Bars based on filters
  • Introducing bar labels and other attributes of the Gantt Chart

Notebooks, WPs and Docs

  • An introduction to Notebooks, WP and docs
  • Addition of notebook topics to P6
  • Entering stories to P6 schedule actions
  • How to assign Work Products and Documents to P6 Projects?
  • How to assist WPs and Docs to schedule activities?

Issues and Risks

  • Understanding issues
  • How issues enter into your P6 Project
  • Managing risks in P6 Project

User Administration

  • An introduction to User Administration
  • Addition of users to the system
  • Introducing security profiles
  • An Introduction to Organizational Breakdown Structure (OBS)
  • Allocating user rights to Projects and WBS elements

General Administration

  • An introduction to administration
  • Understanding admin preferences and admin categories

Primavera P6 Professional Advanced for Project Managers Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Exeter

Exeter is an ancient city located within the county of Devon England with a population of around 129,800 according to mid-2016 est. It is a cathedral city situated on the Exe River about 70 miles southwest of Bristol and 37 miles northeast of Plymouth. The status of the non-metropolitan district has been granted to the city under the rule of the County Council, while unitary authority status was abandoned under the command of coalition government 2010. The city was the most Roman fortified establishment of the southwestern Britain. The early history of the city dates back to the Roman era, although the remains of the Cornish tribe also survived in the city before the Roman Empire.

During the Medieval and Tudor period, the city became a major religious centre, and Exeter cathedral was also found in the middle of the 11th century. Post 16th century Protestant Reformation, the city followed Western Christian tradition and became Anglican. The city was affected by the First World War, although during Second World Was the city centre had undergone significant changes and must of the area was rebuilt. The city became a powerful wool trade centre by the end of the 19th century and now considered as an important centre for tourism and modern business. It has been suggested that the modern name of the city is derived from the anglicised form of the well-known river Exe. 

History

There is no major prehistoric evidence found in the city. The early settlement of the area was established on a dry ridge ending in a spur, and some coins were also discovered during the Mediterranean history. The 42-acre fort named Isca was built by the Romans in AD 55 and served as a base for the legion of the Imperial Roman army that founded during the late Roman republic. The city was commonly known as Isca Dumnoniorum in the Roman era. The fort accommodated the unplanned civilian community of the Celtic Britons and the families of the soldiers. The fortress was demolished, and the site was used for the civilian purposes. Excavation of the area was done in 1970, but due to its closeness with the Cathedral Church of Saint Peter, the site could not be opened for public view.

The Saxons named the city as Escanceaster, they arrived the city after beating the Dumnonians in Somerset and maintained the quarter of the city for Britons, known as Britayne Street till mid of the 16th century. The county corporate status was granted to the city in 1537. During the industrial era, the economy of the city was based on the agricultural products which were locally available. Its geographical location on the fast flowing river contributed towards the development of the early industrial site on drained marshland of the city. The Bristol and Exeter Railway has first arrived in the city in 1844, and the horse-drawn trams were introduced in 1882.

During the 20th century, a new bridge was built made of steel and cast iron and changed the old Georgian bridge. In early 1905, the horse drawn trams were replaced by the electric trams. Later on, with the rise in the traffic problems caused by the trams, these were further replaced by the double-decker buses in 1931. The city was the prime target by the German Luftwaffe during the Second World War resulted in the death of 156 people and demolition of many historic buildings including the Cathedral. After that, little efforts were executed to restore the heritage of the city, and the large areas of the city centre were rebuilt in 1950. The city was severally affected by the serious fireworks, leading to the destruction of the Royal Clarence Hotel and 18 Cathedral Yard.

Project and its management

A project is a unique activity that has a tempo...