Lean Six Sigma Black Belt

Increasing Organisational Profits with Lean Six Sigma

ABOUT THE PROGRAM

As of now the concept of “Customer is King” is held in high esteem by all organisations. To please the customer, the focus is on reducing delivery time. As they say “Time Saved is Money Saved”. Lean Six Sigma is an approach that removes any extra unwanted processes, saves resources and time and makes the entire process streamlined. Lean Six Sigma optimizes organisational processes to increase productivity.

At MSP Training, we ensure the delegates get trained in the concepts of Lean Six Sigma and they are able to cope up with the problems they face in real-time situations at their organisation. The Lean Six Sigma Black Belt training helps the delegates to learn Lean concepts so that they are able to lead a team of professionals during project execution.

  • Using Lean Methodology, decrease Waste Processes and increase Productivity.

  • Lean Six Sigma Certification is not focused to just one particular industry.

  • Experienced and certified instructors to impart knowledge to the delegates during the course

  • Major industries recognize Lean Six Sigma Black Belt Certification

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Courseware

Courseware will also be provided to the delegates so that they can revise the course after the training.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

PREREQUISITES

  • A Green Belt certification
  • Experience of a Green Belt project

TARGET AUDIENCE

  • Green Belt Certified Professionals
  • Project Managers

WHAT WILL YOU LEARN?

After the completion of the course, the delegates will get expertise of the following concepts:

  • Project planning.
  • Determining and managing requirements of stakeholders.
  • How to improve various tools used for gauging and analysing business processes.
  • To determine a customer’s value make use of Lean concepts
  • The delegates learn to implement perfection by the use of low develop pull system.
  • Analyse, Quantify and Choose the best available solutions
  • Understand Process Change
  • Control Business Processes
  • Manage Green Belt Projects

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

The concept of Lean aims at removing the waste processes due to which the project tends to divert away from its scope. Six Sigma, on the other hand, reduces processes variations and couples the processes together more tightly.

In the line of Lean Six Sigma, Lean Six Sigma Black Belt is the one that excels among all. Anybody interested in going through this course must be familiar with the concepts of Lean Six Sigma Green Belt. A Lean Six Sigma Black Belt certified professional leads a team of professionals who are already certified as Green Belt professionals.

IASSC (International Association for Six Sigma Certification™), the only third-party certification authority for Lean Six Sigma, certifies the delegates after passing an examination.

Exam

Exam Type: Closed Book Proctored Exam

Duration: 240 minutes

Questions: 150 Multiple Choice Questions

 


PROGRAM CONTENT

    • Define Phase
      • The Basics of Six Sigma
        • Meanings of Six Sigma
        • General History of Six Sigma & Continuous Improvement
        • What Does A Lean Six Sigma Project Deliver
        • The Problem Solving Strategy Y = f(x)
        • Voice of the Customer, Business and Employee
        • Six Sigma Roles & Responsibilities
      • The Fundamentals of Six Sigma
        • Defining a Process
        • Serious Quality Characteristics (CTQ’s)
        • Poor Quality Cost
        • The Pareto Analysis (80:20 rule)
        • Six Sigma - Measurement Standards
      • Selecting Lean Six Sigma Projects
        • Building a Business Case & Project Charter
        • Developing Project Metrics
        • Financial Evaluation & Benefits Capture
      • Undestanding The Lean Enterprise
        • Lean – An Understanding and its History
        • The Combination of Lean & Six Sigma
        • The Seven Waste Elements
        • 5S
          • Define Straighten, Shine, Standardize, Self-Discipline, Sort

     

    • Measure Phase
      • Process Definition
        • Cause & Effect / Fishbone Diagrams
        • Process Mapping, SIPOC, Value Stream Map
        • X-Y Diagram
        • Failure Modes & Effects Analysis (FMEA)
      • Six Sigma Statistics
        • Basic Statistics
        • Descriptive Statistics
        • Normal Distributions & Normality
        • Graphical Analysis
      • Measurement System Analysis
        • Precision & Accuracy
        • Bias, Linearity & Stability
        • Gage Repeatability & Reproducibility
        • Variable & Attribute MSA
      • Process Capability
        • Capability Analysis
        • Concept of Stability
        • Attribute & Discrete Capability
        • Monitoring Techniques
      • Analyze Phase
        • Patterns of Variation
          • Multi-Vari Analysis
          • Classes of Distributions
        • Inferential Statistics
          • Understanding Inference
          • Sampling Techniques & Uses
          • Central Limit Theorem
        • Hypothesis Testing
          • General Concepts & Goals of Hypothesis Testing
          • Significance; Practical vs. Statistical
          • Risk; Alpha & Beta
          • Types of Hypothesis Test
        • Hypothesis Testing with Normal Data
          • 1 & 2 sample t-tests
          • 1 sample variance
          • One Way ANOVA
        • Hypothesis Testing with Non-Normal Data
          • Mann-Whitney
          • Kruskal-Wallis
          • Mood’s Median
          • Friedman
          • 1 Sample Sign
          • 1 Sample Wilcoxon
          • One and Two Sample Proportion
          • Chi-Squared (Contingency Tables)
        • Improve Phase
          • Simple Linear Regression
            • Correlation
            • Regression Equations
            • Residuals Analysis
          • Multiple Regression Analysis
            • Non- Linear Regression
            • Multiple Linear Regression
            • Confidence & Prediction Intervals
            • Residuals Analysis
            • Data Transformation, Box Cox
          • Designed Experiments
            • Experiment Objectives
            • Experimental Methods
            • Experiment Design Considerations
          • Full Factorial Experiments
            • 2k Full Factorial Designs
            • Linear & Quadratic Mathematical Models
            • Balanced & Orthogonal Designs
            • Fit, Diagnose Model and Center Points
          • Fractional Factorial Experiments
            • Designs
            • Confounding Effects
            • Experimental Resolution
          • Control Phase
            • Lean Controls
              • Control Methods for 5S
              • Kanban
              • Poka-Yoke (Mistake Proofing)
            • Statistical Process Control (SPC)
              • Data Collection for SPC
              • I-MR Chart
              • Xbar-R Chart
              • U Chart
              • P Chart
              • NP Chart
              • Xbar-S Chart
              • CumSum Chart
              • EWMA Chart
              • Control Methods
              • Control Chart Anatomy
              • Subgroups, Impact of Variation, Frequency of Sampling
              • Center Line & Control Limit Calculations
            • Six Sigma Control Plans
              • Cost Benefit Analysis
              • Elements of the Control Plan
    Elements of the Response Plan

Lean Six Sigma Black Belt Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Wokingham

Wokingham meaning ‘Wocca's people's home', situated 6 3 km from London to its West, and having a population of 30,690 is a market town. Wokingham, before 1974 when the local government was reorganized, was a borough. To form the current Wokingham District, it merged in 1974 it merged with Wokingham Rural District. Wokingham achieved the status of a borough in 2007.

Governance:

Northern Wokingham, at one time, was a detached part of Wiltshire that extended into the centre of the town – the area currently occupied by the Norreys, Bean Oak and Dowlesgreen estates. In 1844 it became a part of Berkshire. The then existing parish, in 1894, was divided into rural and urban civil parishes.

The Municipal Corporation Act of 1835 left Wokingham unformed. The Act was reformed in 1883. Due to the Local Government Act 1972, in 1974,  Wokingham and Wokingham Rural District merged to form the non-metropolitan district of Wokingham.  Formed as a unitary authority in 1998, the district has 54 elected councillors presided over by an elected councillor who manages the district and chairs (as a Chairman) all the meetings for a full year. The elections take place in three out of four years for the Chairman Councillor. Since 2002, the Conservative party has been in the seat with a majority. The Shute End is home to the Borough Council Offices in Wokingham.

Topography:

Located on the Emm Brook kin the Loddon Valley in central Berkshire, Wokingham is 33 miles west of central London and between the towns of Reading and Bracknell. Wokingham originally happened to be just a piece of agricultural land on the western front of the Windsor Forest. Wokingham’s soil is rich in loam and has a subsoil of gravel and sand.

The Wokingham town centre is replete with residential areas in almost every direction. The residential areas in the east are home to Dowlesgreen, Norreys, Keephatch and Bean Oak, in the west are Woosehill and  Emmbrook in the northwest. To the south, the areas include Wescott and Eastheath. Other residential areas include Woodcray and Luckley Green which have been present for a long time.

The last 8 decades have seen a lot of development in Wokingham. Dowlesgreen and Woosehill were built on farmland in the late 1960’s to the early 1970’s. Bean Oak was also developed during the same period. Keephatch came to be built in the '90s decade. The Norreys Estate came into existence in the 1960s. The  Norreys Avenue is. however, the oldest residential road having been built in the 1940’s. Norreys Avenue shaped as a horseshoe is located on Norreys Manor (now demolished). Because of this much of the manufactured houses were styled like those belonging to the 1940’s.The road also is home to some brick houses and to three blocks for police residential quarters.

Charities

Wokingham is home to a number of charities helping the needy. The list follows:

  • The Lucas Hospital: It is an almshouse founded in 1663 for helping sixteen elderly men who came here from the neighbouring location.
  • Wokingham United Charities: This charity provides various grants to people who live in the Wokingham area. They help them by getting rid of their poverty, distress and hardship. Besides they also provide shelter to the needy.
  • The Rotary Club of Wokingham: The club form a part of the Rotary International. It’s members take on many activities to raise funds for distributing to the needy whether locally or worldwide.

Churches

  • Wokingham Baptist Church
  • Wokingham Baptist Church
  • St Paul's Church
  • Wokingham Methodist Church
  • Christchurch Wokingham (CofE)
  • Woosehill Community Church
  • Norreys Church
  • Paul's Church (CofE)
  • Kings Church Wokingham
  • All Saints' Church (CofE)

Manors :

  • Evendon's Manor
  • Keep Hatch (demolished)
  • Norreys' Manor now named as Norreys Avenue )

Lean Six Sigma

What is Le...