Lean Six Sigma Black Belt Upgrade

Reducing “The Waste” with Lean Six Sigma

ABOUT THE PROGRAM

An organisation while producing may have some processes in the production line which seem unwanted at some stage. There is a requirement to eliminate such waste processes from project environment as unwanted processes cause delay in to the production line. The Lean Six Sigma methodology is used to identify and eliminate extra processes. We at MSP Training train delegates with Lean Six Sigma methodology through Lean Six Sigma Black Belt Upgrade course. Our instructors are Lean Six Sigma certified professionals.

  • The Lean Six Sigma Certifications are delivered by experienced and certified professionals

  • Understand the principals that lie behind Lean Six Sigma methodology

  • A Majority of the industry supports Lean Six Sigma to achieve its goals

  • Lean Six Sigma is not industry specific

  • Get higher salaries and perks as Lean Six Sigma professionals.

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Exam(s) included

Exams are provided, as part of the course. Obtaining certification is dependant on passing these exams

Includes

Certificate

Delegates will get certification of completion at the end of the course.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

PREREQUISITES

The delegate must hold a Green Belt Certification to be elligible for the Black Belt certification exam.

TARGET AUDIENCE

  • Lean Six Sigma Green Belt Certified Professionals
  • Green Belt Professionals who are interested in improving the organisation's productivity through the use of Lean Six Sigma principals and methodologies
  • Experienced Black Belt professionals who want to upgrade themselves to the latest concepts

WHAT WILL YOU LEARN?

  • Use the DMAIC tools and the complications that may arise out of them.
  • Find solutions to the DMAIC project problems
  • Learn to manage issues with the team
  • Work at different levels in a team
  • Analyse the relation between input and outputs of the processes

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

There are 8 kinds of wastes that an organisation may face. They are described as “DOWNTIME” – an acronym for

  • D – Defective Processes
  • O – Overprocessing
  • W – Waiting Period
  • N – Non-Used Employee Talent
  • T – Transport
  • I – Inventory
  • M – Motion
  • E – Excess Production

To avoid the problems caused by DOWNTIME, Lean Six Sigma recommends the 5s technique which every Lean Six Sigma professional is familiar with. This 5s technique is made up of the following 5 steps (names provided both in English as well as Japanese)

  • Sort (Seiri)
  • Straighten (Seiton)
  • Shine(Seiso)
  • Standardise(Seiketsu)
  • Sustain(Shitsuke)

The first step, Sort, makes work easier as it eliminates the obstacles and reduces the chances of being disturbed with unnecessary items. It also removes unwanted processes or items that are not required in the production phase.

The second step, Straighten, arranges all items in a first cum first serve basis so as to easily select them for use. The third step, Shine, focuses on keeping the workplace clean such that any kind of machinery is not affected. The fourth step, Standardize, selects the best steps to be followed for the production. The last step, Sustain, refers to keeping everything in order and also make sure that standards are implemented.

In any organisation, during the production process, waste is bound to occur. Generally, this can happen as unnecessary steps creeping into the production line or processes executing with varying times. Both ways the production is affected and organisation will go into a loss. Implementation of Lean Six Sigma methods help the organisations out of such conditions. Lean Six Sigma has three levels that professionals can take up starting from the Yellow Belt, into the Green Belt and finally the Black Belt. However, there is a fourth course that is offered by Lean Six Sigma – the Lean Six Sigma Black Belt Upgrade course. This course focuses on professionals who are already Green Belt Professionals and want to upgrade to Black Belt. Unlike the Black Belt course, the Upgrade version for the same does not teach the concepts of Green Belt before going into the Black Belt course.

Exam

A delegate must attempt 100 questions in the Lean Six Sigma Black Belt Upgrade exam. A minimum of 70% marks is required to get the certification. The language of the exam is English. In case the delegates require any other information they will be provided with the same by the examiner just before the exam.


PROGRAM CONTENT

Part one:

  • Review Green Belt  principals
  • Describe Project Charters or Workshop
  • What are required jobs?
  • What are expectations on results?
  • What is Minitab?
  • Basic Statistics 2
  • Project Report Outs
  • Daily Tech backs
  • Define Change Management
  • Exercise based on Value Stream Mapping
  • Project Management
  • Measurement System Analysis
    • Attribute Agreement Analysis
    • Continuous Data
  • Capability Analysis
    • Attribute Data
    • Continuous Normal Data
    • Continuous Non-normal D

Part 2:

    • Reviews of Project
    • Review of Assumption Testing
    • Methods and Techniques of Minitab Graphical
    • Flow Review
    • Central Limit Theorem
    • Confidence Intervals
    • Pull Review
    • Mean & Variance Tests
    • Proportions Testing
    • Contingency Tables GOF
    • Sample Size Selection
    • Correlation/Linear Regression
    • One Way ANOVA
    • Improving Phase Roadmap
    • Getting Familiar With Design of Experiments (DOE)
    • Full Factorial Designs
    • 2K Factorial Designs
    • Attribute DOE
    • Project Reviews

    Part 3:

    • 2K Fractional DOE Designs
    • Simulation Exercise DMAIC / DOE
    • Logistic Regression – An Introduction
    • Advanced Regression
    • Introduction to Control Charts
    • Variable SPC Techniques
    • Attribute SPC Techniques
    • Control Methods
    • Introducing  Surveys
    DMAIC Review & Final Reports

Lean Six Sigma Black Belt Upgrade Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Jersey

Far cry from other regions of United Kingdom, Jersey has its unique history. Jersey officially known as bailiwick of Jersey is run under the administration of The Crown. The coast of Normandy i.e France is located near to it. Earlier the dukes of the France has control over the jersey and ultimately became kings of England. In the deadly war, Normandy was lost by the kings. The ball was in the court of the jersey, either to choose association with the UK or not. It comes under the jurisdiction of the crown prince of the United Kingdom but still, it is not considered to be a part of the United Kingdom. Jersey is a self-governed parliamentary form of Democracy under the monarchy system.

This has own financial, legal and judicial systems. It has an international identity separate from the United Kingdom. The queen of the United Kingdom appoints lieutenant governor on her behalf to see the administration work of the jersey. All the responsibilities of the development work being done by the United Kingdom government. With regard to the defence of the sovereignty of the territory, the United Kingdom government is responsible for it. The 28 countries group of the Europe known as the European Union has a special relationship with it. Because of its closeness to the English people, the preferred language of this region is English and currency is Pound. The 2014 population index shows 1 lakh people in this region.

History

Because of its strategic location between the northern coast of France and the southern coast of England, it has shown a great impact on the inner politics of the region. The jersey history is very old nearly a large number of iron coins were found some years ago by two people with their modern equipment. The presence of Roman Empire is also found here. Various fortifications had been constructed during 1939-1945 by the Germans.

Politics and law

There is only single house assembly with total 51 members. Since many years, there has not seen many enthusiasts among voters. The elected council of ministers chose its chief minister. The lieutenant governor acts as a conduit between the government and the United Kingdom.The law follows in the United Kingdom is not from one country but mixed of various countries such as the United Kingdom, France, and Norman.

International relations

The government of the country is very active in its territory interests and trying to develop good relations with various countries. There have been numerous discussions over the independence within the assembly but no concrete solution has come so far. A number of leaders emerge out of its course.

Geography and Climate

Jersey is an island including Intertidal zone and reclaimed land. It is also the southernmost and largest Channel Islands. The climate is temperate with not many severe winters as well as not many severe summers. There has an impact on the weather condition due to the Atlantic Ocean. It makes the process of heating and cooling very slowly throughout the year. In winter, there is a warming influence on the coastal region and cooling influence in summer. The official met office kept records of yearly pattern of climate and which would be used for future reference.

Economy 

The services sector is the prominent sector in the economy of the region. It includes financial services such as tourism and hospitality which further adds hotels, motels, restaurants, bars, transport and Communications and a few more. Other prominent businesses are retail and wholesale, construction and Agriculture. At purchasing power parity, Jersey pulled a rabbit out of a hat and ahead of all the world’s major advanced economies.

Lean Six Sigma

What is Le...