Lean Six Sigma Black Belt Upgrade

Reducing “The Waste” with Lean Six Sigma

ABOUT THE PROGRAM

An organisation while producing may have some processes in the production line which seem unwanted at some stage. There is a requirement to eliminate such waste processes from project environment as unwanted processes cause delay in to the production line. The Lean Six Sigma methodology is used to identify and eliminate extra processes. We at MSP Training train delegates with Lean Six Sigma methodology through Lean Six Sigma Black Belt Upgrade course. Our instructors are Lean Six Sigma certified professionals.

  • The Lean Six Sigma Certifications are delivered by experienced and certified professionals

  • Understand the principals that lie behind Lean Six Sigma methodology

  • A Majority of the industry supports Lean Six Sigma to achieve its goals

  • Lean Six Sigma is not industry specific

  • Get higher salaries and perks as Lean Six Sigma professionals.

WHAT'S INCLUDED ?

Find out what's included in the training programme.

Includes

Exam(s) included

Exams are provided, as part of the course. Obtaining certification is dependant on passing these exams

Includes

Certificate

Delegates will get certification of completion at the end of the course.

Includes

Key Learning Points

Clear and concise objectives to guide delegates through the course.

Includes

Tutor Support

A dedicated tutor will be at your disposal throughout the training to guide you through any issues.

PREREQUISITES

The delegate must hold a Green Belt Certification to be elligible for the Black Belt certification exam.

TARGET AUDIENCE

  • Lean Six Sigma Green Belt Certified Professionals
  • Green Belt Professionals who are interested in improving the organisation's productivity through the use of Lean Six Sigma principals and methodologies
  • Experienced Black Belt professionals who want to upgrade themselves to the latest concepts

WHAT WILL YOU LEARN?

  • Use the DMAIC tools and the complications that may arise out of them.
  • Find solutions to the DMAIC project problems
  • Learn to manage issues with the team
  • Work at different levels in a team
  • Analyse the relation between input and outputs of the processes

Enquire Program

Fill in the form below & we'd get back to you.

PROGRAM OVERVIEW

There are 8 kinds of wastes that an organisation may face. They are described as “DOWNTIME” – an acronym for

  • D – Defective Processes
  • O – Overprocessing
  • W – Waiting Period
  • N – Non-Used Employee Talent
  • T – Transport
  • I – Inventory
  • M – Motion
  • E – Excess Production

To avoid the problems caused by DOWNTIME, Lean Six Sigma recommends the 5s technique which every Lean Six Sigma professional is familiar with. This 5s technique is made up of the following 5 steps (names provided both in English as well as Japanese)

  • Sort (Seiri)
  • Straighten (Seiton)
  • Shine(Seiso)
  • Standardise(Seiketsu)
  • Sustain(Shitsuke)

The first step, Sort, makes work easier as it eliminates the obstacles and reduces the chances of being disturbed with unnecessary items. It also removes unwanted processes or items that are not required in the production phase.

The second step, Straighten, arranges all items in a first cum first serve basis so as to easily select them for use. The third step, Shine, focuses on keeping the workplace clean such that any kind of machinery is not affected. The fourth step, Standardize, selects the best steps to be followed for the production. The last step, Sustain, refers to keeping everything in order and also make sure that standards are implemented.

In any organisation, during the production process, waste is bound to occur. Generally, this can happen as unnecessary steps creeping into the production line or processes executing with varying times. Both ways the production is affected and organisation will go into a loss. Implementation of Lean Six Sigma methods help the organisations out of such conditions. Lean Six Sigma has three levels that professionals can take up starting from the Yellow Belt, into the Green Belt and finally the Black Belt. However, there is a fourth course that is offered by Lean Six Sigma – the Lean Six Sigma Black Belt Upgrade course. This course focuses on professionals who are already Green Belt Professionals and want to upgrade to Black Belt. Unlike the Black Belt course, the Upgrade version for the same does not teach the concepts of Green Belt before going into the Black Belt course.

Exam

A delegate must attempt 100 questions in the Lean Six Sigma Black Belt Upgrade exam. A minimum of 70% marks is required to get the certification. The language of the exam is English. In case the delegates require any other information they will be provided with the same by the examiner just before the exam.


PROGRAM CONTENT

Part one:

  • Review Green Belt  principals
  • Describe Project Charters or Workshop
  • What are required jobs?
  • What are expectations on results?
  • What is Minitab?
  • Basic Statistics 2
  • Project Report Outs
  • Daily Tech backs
  • Define Change Management
  • Exercise based on Value Stream Mapping
  • Project Management
  • Measurement System Analysis
    • Attribute Agreement Analysis
    • Continuous Data
  • Capability Analysis
    • Attribute Data
    • Continuous Normal Data
    • Continuous Non-normal D

Part 2:

    • Reviews of Project
    • Review of Assumption Testing
    • Methods and Techniques of Minitab Graphical
    • Flow Review
    • Central Limit Theorem
    • Confidence Intervals
    • Pull Review
    • Mean & Variance Tests
    • Proportions Testing
    • Contingency Tables GOF
    • Sample Size Selection
    • Correlation/Linear Regression
    • One Way ANOVA
    • Improving Phase Roadmap
    • Getting Familiar With Design of Experiments (DOE)
    • Full Factorial Designs
    • 2K Factorial Designs
    • Attribute DOE
    • Project Reviews

    Part 3:

    • 2K Fractional DOE Designs
    • Simulation Exercise DMAIC / DOE
    • Logistic Regression – An Introduction
    • Advanced Regression
    • Introduction to Control Charts
    • Variable SPC Techniques
    • Attribute SPC Techniques
    • Control Methods
    • Introducing  Surveys
    DMAIC Review & Final Reports

Lean Six Sigma Black Belt Upgrade Enquiry

 

Enquire Now


----- OR -------

Reach us at 0121 368 7851 or info@msptraining.com for more information.

ABOUT Nottingham

Nottingham is a town under the unitary administration of Nottinghamshire. It is 128 miles far from London. It is the seventh biggest urban area of the Great Britain. It is located in The East Midland territory of the UK. It is nearby low hills surfaces along river Trent lower valley. It is the seventh biggest urban area of the Great Britain. It has prominent industries such as Bicycle, Rayleigh and tobacco. During the Industrial transformation, due to lace making business and textile industries, this city flourished both the way i.e volume and wealth.

It gained extensive acceptance from major contributors such as Boots the chemist, Raleigh bikes and Players Cigarettes. The city also rated insufficiency level world city and Alpha city by the think-tank group of Globalization and World Cities Research Network. The city has biggest publicly possessed bus network in the UK and it has an outstanding public transport system. It is one of the six nominated cities of science catering 15000 businesses of IT sector including environmental technologies, biomedical sciences and advanced engineering.

History

The city exits date earlier than Anglo-Saxon era. The city is known as Place of Caves. A large number of caves found in the outskirts of the town. “Snotingaham” name came into existence during the rule of Saxon. The river Leen has a castle on the outcrop of sandstone. The Anglo Saxon was confined Up to Lace Market of today. The fortification of the town happened to save from attacks. The proper ditches were also constructed so that it leads to saving from Norman Conquest. Supporters of Prince John occupied the castle during the return of Richard the Lionheart. Later on, it was surrounded by Richard. A sharp conflict happened and again captured by Richard. During the 15th century, Nottingham got famous in exporting the religious sculptures. A famous German traveller visited the town in mid-17 century. He said Nottingham is the most beautiful and modern town in the outskirts of London. Industrial revolution booms the textile industry. During the Second World War, the industry saw sharp fall.

Governance

Nottingham city council is looking after administrative work of the city. Each councillor looks after its ward.The duration of the councillors is 4 years. The city also has lord mayor but he has no executive and formal power. There are total 3 parliament seats in the region.

Education

Education is administered by the unitary of the city, managed by Nottingham City Council. Their main aim is to give high-quality knowledge, research and professional education. There are two main universities and their various campuses in the city, providing education to more than 60 thousand students annually. The city also has several sixth form academies and colleges which provide training and education to the adults.

Attractions and architecture

The city became famous for its historic buildings, memorials, landmarks, monuments and statues. Most famous and worthwhile attraction to visit is Nottingham Castle, includes an art gallery and museum. Other famous landmarks are ancient sandstone caves, Wollaton Hall, Old Market Square, Lace Market, Highfields Park, Green’s Mill and Science Centre, The Great Central Railway and Galleries of Justice Museum. The city also entertains many great festivals and ceremonies. Among that the most popular is Nottingham Goose Fair.  Apart from these, the city has most energetic first-class shopping centers, restaurants, bars, theatres, museums and art galleries.  

Sports

Nott County is the professional football club. Nottingham is going to bid as host of 2018 FIFA world cup for the country. The city would receive if successful in the bid. The Trent Bridge acts as a playground for the County cricket club. Other major games are Rugby, marathon, Ice hockey and boxing.

Lean Six Sigma

What is Le...